This deliverable includes the information on the type of cables, cable length and junction box details. The instrument cable schedule and JB wiring details are to be discussed today.
1) Instrument Cable Schedule: The instrument cable schedule is a document containing a list of instrument cables. This document shows the cables as well as glands required for each instrument or connection.

2)Instrument Junction Boxes and Wiring Schedule: A junction box is an enclosure that is used to interconnect the cables between field devices and the control room. The junction boxes enclose terminal strips for cable termination.

#InstrumentCableSchedule #JBwiring #Interconnection #Cableschedule

This document shall be used mainly to prepare I&C engineering deliverable/or documents. In other words this documents covers the summary of specific requirements listed for ready reference as Selection or Sizing guide while performing Detail Engineering Activities.

Note: Keep watching our channel eFunda where we are creating videos related to Engineering Topics and saved under separate play List - Engineering.

Also, Please follow us on Instagram
eFunda Instagram –   / efundachannel  

Regards,
Team eFunda


Смотрите видео Instrument Cable Schedule / JB Wiring Diagrams (Part - 12F) онлайн без регистрации, длительностью часов минут секунд в хорошем качестве. Это видео добавил пользователь eFunda Channel 17 Декабрь 2021, не забудьте поделиться им ссылкой с друзьями и знакомыми, на нашем сайте его посмотрели 17,501 раз и оно понравилось 300 людям.