Excess sewage from Mexico overwhelms wastewater treatment plant at the border

Опубликовано: 10 Март 2023
на канале: CBS 8 San Diego
5,347
43

Damaged equipment has been taken offline at the International Wastewater Treatment Plant due to excessive amounts of sewage coming from Mexico.

Since August, the facility has been inundated with an extra 5 million gallons of wastewater per day due to a pipeline break south of the border.

Normally, the treatment plant is equipped to process 25 million gallons per day, but the excess flows have increased that number to 30 million gallons per day, causing damage to the equipment.

MORE: https://www.cbs8.com/article/news/loc...


Смотрите видео Excess sewage from Mexico overwhelms wastewater treatment plant at the border онлайн без регистрации, длительностью часов минут секунд в хорошем качестве. Это видео добавил пользователь CBS 8 San Diego 10 Март 2023, не забудьте поделиться им ссылкой с друзьями и знакомыми, на нашем сайте его посмотрели 5,347 раз и оно понравилось 43 людям.