Exchange Building Completes Final Lift | LIFTbuild Vertical Manufacturing Methodology

Опубликовано: 13 Февраль 2023
на канале: xcdetroit
529
8

The milestone completes a proof-of-concept on a technology that is transforming how the world is built.

LIFTbuild has lifted the final floorplate on the Exchange Building in downtown Detroit’s Greektown neighborhood, capping 14 total floorplate lifts plus the roof plate. The last two floors at Exchange will be built conventionally along with the prefabricated façade system.

The Exchange Building served as LIFTbuild’s proof-of-concept prototype project. Exchange is a 16-story residential tower that includes 153 residential rental units, 12 for-sale condominiums, and ground-level opportunities for innovative office and retail concepts totaling 166,000 SF. Apartment homes are located on floors two through 14, with condominium residences on floors 15 and 16. Exchange is the first residential development in Greektown in about 60 years. Tenant move-in at Exchange is slated for this summer and will be preceded by a formal ribbon cutting.

For more information on Exchange, visit exchangedetroit.com.

To learn more about the LIFTbuild methodology and why it’s so important for the construction industry to pursue continuous improvement, listen to episode 6 of Barton Malow’s Said Differently podcast, titled Transforming How the World is Built.


Смотрите видео Exchange Building Completes Final Lift | LIFTbuild Vertical Manufacturing Methodology онлайн без регистрации, длительностью часов минут секунд в хорошем качестве. Это видео добавил пользователь xcdetroit 13 Февраль 2023, не забудьте поделиться им ссылкой с друзьями и знакомыми, на нашем сайте его посмотрели 52 раз и оно понравилось людям.