SA is a form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.
Delivery of the total quantity of material specified in a scheduling agreement item is spread over a certain period in a delivery schedule, consisting of lines indicating the individual quantities with their corresponding planned delivery dates.
You can write to me at [email protected]
For any business deals –
Telegram: https://t.me/SAP_Tutorials_2021
What's App - https://wa.me/message/KXEJ25334LI5A1
Twitter: / saptutorials_11
Disclaimer: “Copyright @SAP Tutorials.
All content on this channel is subject to copyrights, illegal use of content from this channel is prohibited & will result in an immediate takedown. Content can't be reproduced without prior written permission.
For any other queries please email [email protected]
“All the videos, images, PPT, and graphics used in the video are my own work and this channel does reserve claim any right over them.
If you have a copyright issued for your own content in the video, then you can simply write: [email protected] Any reproduction or illegal distribution of the content in any form will result in immediate action against the person concerned.”
“Copyright @SAP Tutorials (2021).
Смотрите видео 07.02) Scheduling agreements (SA) in SAP MM (S4 HANA / ECC) онлайн без регистрации, длительностью часов минут секунд в хорошем качестве. Это видео добавил пользователь SAP Tutorials - Santosh 08 Ноябрь 2022, не забудьте поделиться им ссылкой с друзьями и знакомыми, на нашем сайте его посмотрели 18,502 раз и оно понравилось 211 людям.