This lab demonstration clarifies these lean manufacturing related concepts:
The 5 S (The effect of violating 5 S in a warehouse is shown)
Muda, mura, and muri
The muda audit form
The workplace layout and its effect on muda, mura, and muri
Spaghetti diagram
Travel chart
The following is the link for layout 1:
• Lab 03 Layout 1: Identifying and Redu...
The following is the link for layout 3:
• Lab 03 Layout 3: Identifying and Redu...
Watch video Lab 03 Layout 2: Identifying and Reducing (Muda) Waste by Improving Workplace Layout online without registration, duration hours minute second in high quality. This video was added by user Industrial Engineering and Manufacturing 02 January 2022, don't forget to share it with your friends and acquaintances, it has been viewed on our site 251 once and liked it 3 people.