The white body main welding line | conveyor line being tested for empty | operation welding Duoyuan
The welding robots or machines are tested for movement accuracy, speed, and timing. This includes checking the robotic arms, welding heads, and other components to ensure they are operating within the required specifications.
Sensors and alignment systems are checked to ensure that they correctly guide the bus frames into the welding stations.
The conveyor system, which moves the bus frames through the various welding stations, is run without any load. This ensures that the movement is smooth, consistent, and free of obstructions.
The empty operation welding test is performed to ensure that the conveyor line and welding robots or machines are functioning correctly without any actual bus frames present. This test helps identify any potential issues in the system, such as misalignment, synchronization problems, or mechanical faults.
The "white body main welding line" refers to the section of the bus production line where the main structure, or "white body," of the bus is assembled and welded. This is before any painting or additional components are added, hence the term "white body."
Chinese web: www.zzdy.cn
English web: www.vehicleassemble.com
Address: Zhengzhou Duoyuan Automobile Equipment Co., Ltd.
Watch video The white body main welding line | conveyor line being tested for empty | operation welding Duoyuan online without registration, duration hours minute second in high quality. This video was added by user DUOYUAN EQUIPMENT 15 August 2024, don't forget to share it with your friends and acquaintances, it has been viewed on our site 56 once and liked it 1 people.