Specialist bridge building machine constructing a high speed rail viaduct

Published: 11 August 2024
on channel: HS2 Ltd
3,328
169

For the first time in the UK, a specialist cantilever process has built the first section of the 472 metre River Tame West Viaducts.

The process installs pre-cast concrete segments produced at our nearby factory, where the team have celebrated making the first 1,000 segments.

Follow us on social media:
Twitter:   / hs2ltd  
Instagram:   / hs2ltd  
Facebook:   / hs2ltd  
LinkedIn:   / high-speed-two-hs2-ltd  

#HS2 #Construction #engineering #bridge #viaduct #railways #railwayline #machinery #civilengineering #highspeedtrain

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].


Watch video Specialist bridge building machine constructing a high speed rail viaduct online without registration, duration hours minute second in high quality. This video was added by user HS2 Ltd 11 August 2024, don't forget to share it with your friends and acquaintances, it has been viewed on our site 3,32 once and liked it 16 people.